General Description
Outfitted with the zero leak bidirectional checking sole-noid valves, this energy unit is intended to the operation of two independent circuits. Which are respectively for the key and subordinate platforms of the double scissors lift. Two cut-off valves are applied for lowering the machine manually in case of power loss. If far more independent circuits are demanded for your application please contact us for availability.
Remark: 1. Please check with our product sales engineer for the various pump displacement, motor electrical power or tank capability.
2. CSA or UL certified motors are available on request.
Exclusive Notes
one. The AC motor is of S3 duty cycle, which could only do the job intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
two. Clean every one of the hydraulic parts concerned before set up of the electrical power unit.
three. Viscosity with the oil shoud be 15~46 cst,as well as oil really should be clean and free of impurities,N46 hydraulic oil is encouraged.
4. The power unit should really be mounted vertically.
five. Check the oil level during the tank immediately after the original running of your electrical power unit.
six. Oil shifting is required following the first 100 operation hours,afterwards once each and every 3000 hrs.
Electrical power UNITS FOR DOUBLE-SCISSORS LIFT
Tags: