We – EPG Team the greatest gearbox & motors , couplings and gears factory in China with 5 distinct branches. For far more specifics: Mobile/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778083988828
solution identify:
China supplier induction Electric Motor Three Sectionasynchronous MS 801-6 .37KW ac 220V
Solution Description:
YE2 Collection Cast of Iron Three Stage Induction Motor is specially created for European marketplace, whose terminal box is situated on
the best of motor.They are absolutely enclosed and admirer-cooling created. They are recently made in conformity with the pertinent
demands / principles of IEC&DIN42673 requirements.
Sort |
YE2 |
Energy |
.75~315kw |
Insulation |
F / B, H/B |
Voltage and frequency |
380/400/415/660/690V 50/60hz |
Speed |
3000/1500/1000/750/600 rpm |
Mounitng |
IMB3/IMV1 |
Cooling and ventilation |
TEFC in accordance with IC411 of IEC60034-6. |
Winding |
one hundred% Cooper Wire |
Protection class |
IP54/IP55 |
Vibration |
vibration class A, vibration class B is available on request. |
Quality assurance |
ISO9001 |
Site conditions |
from -15°C t0 +40°C and altitude below 1000 meters |
packaging:
Firm Present :
certification
Around the world Marketing & Provider Network
Worldwide Perfect Marketing provider network is 1 of jinlite motor’s benefit. we have 40 branches in china major town,8 branches in
the Abroad ,Our organization penetrates a lot more than sixty international locations and regions such as South The united states, North The united states,Europe, Asia
Center East and Africa, Giving us speedy attain capacity from revenue, support, procurement and Transportation since inception, Pinxing
constantly uphold the advancement technique of industry globalization. we segment and placement consumers needs and ept marketplace. our
products and support are commonly used in worldwide business, and functionality stable and basic safety.we custom made various motors for different
industries
FAQ
Q: Do you supply OEM services?
A: Yes
Q: What is your payment phrase?
A: 30% T/T in advance, 70% equilibrium when obtaining B/L duplicate. Or irrevocable L/C.
Q: What is your guide time?
A: About 30 days soon after receiving deposit or original L/C.
Q: What certifiicates do you have?
A: We have CE, ISO. And we can apply.
The use of original products manufacturer’s (OEM) component numbers or logos , e.g. CASE® and John Deere® are for reference reasons only and for indicating solution use and compatibility. Our company and the outlined replacement parts contained herein are not sponsored, approved, or made by the OEM.